Blog


Browse our latest blog posts to be in the know.

Brick house entry with gray door, large window, and shrubs along the front walkway
November 10, 2026
The Keystone Trail closed between Blondo Street and Maple Street on October 15, and the City of Omaha lists it as closed through November 30. The underpasses at Blondo and Maple are closed too, which matters more than the closure itself. Those two underpasses let you cross both arterials without stopping for traffic. This gap is one of four on the same trail this fall. The City of Omaha's October 2026 trails update gives the same reason for all four: "the NRD's Culvert Repair work," meaning the Papio-Missouri River Natural Resources District. These closures are one repair program spread along the creek. Once you see that, the fall comes down to a simple rule for Keystone. If you head north past Maple, the trail opens up. If you head south, the detours keep coming until December. The closures have one cause The city's page lists the trail as "Under Construction" and gives four culvert-repair windows. Here they are in order, north to south, with the underpass status the city lists for each.
Front porch of a beige house with brick steps, a wooden door, and autumn leaves on a tree nearby
November 10, 2026
The first soccer field at Bennington Road and 156th Street took about five years, from the 2021 announcement to an April 2026 ribbon cutting. The next four are scheduled to take about ten months. The gap between those two timelines explains how Neumeyer Farm Park got built. Construction was never the slow part. The money was, and much of it came from Bennington residents, a local employer, and youth sports clubs. That work is the reason the Phase 2 money arrived the way it did, and why Bennington Soccer Club should go into summer 2027 with five fields instead of one. A farm at the corner most of town drives past Neumeyer Farm Park covers 50 acres. Bennington Road runs along the north side, 156th Street along the east, and Kempten Creek Drive wraps the south and west. The Neumeyer family settled in Bennington in the late 1800s and farmed the land for generations, then donated part of the property to the city in 2020. In the 2021 announcement , Nancy Neumeyer said she wanted Neumeyer Farm to be a place where families make memories and residents connect. "I'm so glad it will continue to serve the community, for perpetuity," she said. The city announced its plans in November 2021, and they were big. The early master plan called for seven multipurpose fields, close to 800 parking spaces, trails, a pavilion and great lawn, a farm-themed play area, and a splash pad that would turn into an ice rink in winter. Tennis courts, sand volleyball and a dog park were listed as possibilities, with a fieldhouse or recreation center as a long-term idea. The announcement also said the park would be built in phases, contingent on donations. WOWT put the price of that vision at $10 million when it was announced. For a city Bennington's size, $10 million can't come out of the regular budget, so the project was going to move at the speed of fundraising. How Phase 1 got paid for The first money came from local groups. According to WOWT's 2021 report, Bennington Soccer Club and Bennington Youth Football had pledged a combined $300,000 toward the complex. The Bennington Community Foundation lists a $30,000 grant to the Neumeyer Farm Park & Athletic Complex in its 2021–2022 cycle. OneStaff Medical bought naming rights to the athletic complex, KETV reported . Those commitments then drew in state money. More than 100 community members gave early donations, and together with the OneStaff Medical sponsorship they helped the project qualify for a $437,700 matching grant under Nebraska's Shovel-Ready Capital Recovery & Investment Act. A matching grant only pays when local money is already raised, so those neighbor donations determined whether the state's share came in at all. When the Phase 1 construction announcement came in June 2023, the scope was much smaller than the 2021 plan: one full-size athletic field, a parking lot along Bennington Road, and a first stretch of walking and biking trail. The city gave Blade Masters a $970,000 contract for the work. The announcement predicted a playable field by mid-2024. The ribbon was cut during a game Phase 1 was officially finished on Friday, April 10, 2026. As Bennington Buzz described it, city leaders, Chamber of Commerce members and soccer families met at 5:30 p.m. for the ribbon cutting, and players were already in a live match on the new field while the ribbon was cut. Mayor Clint Adams told Bennington Buzz that "this project represents more than just a new field," calling it "an investment in our kids, our families, and the future of recreation in our community." At the same event he said Phase 2 would go out to bid that summer. That plan held, and the reason goes back two years. Phase 2's money was already waiting In April 2024, while Phase 1 was still under construction, the project announced a $2.1 million federal Community Project Funding grant for the next phase. The grant covers more athletic fields, more parking, and trails and greenspace across 10 acres. The grant announcement named Bennington Soccer Club as a project participant and pointed to the club's Spring Cup, a three-day tournament it said brings more than 1,300 athletes and coaches to Bennington each year. Phase 1 had to raise its money before it could start. Phase 2 had its money set aside before Phase 1 was even finished, so the second phase is mostly a construction schedule. Here is the full sequence: November 2021: The city announces Neumeyer Farm with a seven-field master plan. June 2023: Blade Masters wins the $970,000 Phase 1 contract, backed by local donors and the state matching grant. April 2024: The $2.1 million federal grant for Phase 2 is announced. April 10, 2026: Phase 1 ribbon cutting. September 14, 2026: The city council awards the Phase 2 contract. July 2027: Estimated Phase 2 completion. What September's vote bought At its September 14 meeting, the Bennington City Council voted unanimously to give Blade Masters, Inc. a $1,623,369.88 base-bid contract for Neumeyer Farm Park Phase 2. The motion specifically included 8-foot sidewalks. The Douglas County Post-Gazette reported that four contractors bid and that Blade Masters came in lowest, against an original budget of about $2.1 million. That puts the winning bid almost $480,000 under budget. City officials told the Post-Gazette that part of the gap came from Blade Masters being a smaller contractor with less overhead. They also said the company had references from similar park projects in Omaha, and that it built Phase 1. The Post-Gazette lists the Phase 2 scope as: Four more sodded fields Sidewalks On-street parking Benches and similar amenities JEO Consulting Group will manage construction under a $65,000 contract amendment the council approved the same night. The contract allowed work to start as early as October, with completion estimated for July 2027. Add it up and the park goes from one field to five by next summer, which is five of the seven fields sketched back in 2021. Why the soccer club wanted more fields When Phase 1 got underway, Bennington Soccer Club's president said more than 600 local kids were playing soccer each season. One field can't hold that many players, and at the ribbon cutting, club board president Justin Hughes told Bennington Buzz the expansion is about more than practice time: "It allows us to host more games here and be a very attractive club for not only other teams in Nebraska, but especially as we try to grow our tournament." Hughes also brought up the weather. "We all know that Nebraska weather can be suspect, so it gives us much more versatility," he said, adding that the space lets the club train and play through more of the year. If the club grows its tournament, visiting teams will use the on-street parking and sidewalks included in Phase 2. What's still only a plan Several features people connect with Neumeyer Farm aren't part of the contract the council just approved. In April 2026 reporting, restrooms and concessions were described as longer-term amenities, not Phase 2 work. The splash pad, playground and pavilion from the 2021 master plan aren't in the Phase 2 scope either, and the tennis courts, dog park and fieldhouse were only ever listed as possibilities or long-term ideas. The trail along Big Papio Creek is a separate project on a later schedule. KMTV reported in 2024 that a planned trail would connect neighborhoods south of Bennington Road to downtown and to the youth sports complex, using a $2 million MAPA and federal grant, with construction starting in 2028. In August 2026, Bennington Buzz reported that the Heritage Trail segment would run from the south side of the 156th Street bridge, past the fire department and into the Heritage subdivision. Design and environmental work is set for 2027, with construction targeted for 2028 if grant funding comes through. Johns-Bohn Park is at 162nd Street and Bennington Road, and no trail route linking it to Neumeyer Farm has been funded. The same donors are holding November events The Bennington Community Foundation, which gave the park $30,000 early on, has two events in November. Blue Jeans and Blazers is Friday, November 20, at 6 p.m. at The Barn at Ackerhurst Dairy Farm, 15220 Military Road, with auctions, awards and music from Interstate Daydream. Santa Comes to Bennington is Sunday, November 29, from 1 to 3 p.m. at Bennington Elementary, with cocoa, carols and photos. Details for both are on the Foundation's events page . If you're thinking about a home on Kempten Creek Drive or anywhere near Bennington Road and 156th, five fields and a tournament schedule will change what weekends sound like there. We're glad to walk you through which streets will feel the game-day traffic and which will mostly just get the view. Reach out to SK & Ren and let's talk.
Brick house entrance with a wooden front door and window beside it
November 10, 2026
MainStreet of Fremont's 32nd Annual Christmas Walk falls on Saturday, Nov. 28, which is Small Business Saturday. On the same day, the 2026 Window Showdown opens to public voting. Downtown businesses enter decorated storefronts, and anyone who walks past can scan a code and vote for a favorite until Dec. 16. The Walk gets the crowd. The Showdown gives you nearly three weeks of reasons to come back. For Nye Hawthorne households, here's how the Saturday works and how the weeks after it work. Saturday runs in two halves The MainStreet of Fremont event page lists the Walk from 10 a.m. to 7 p.m. The activity schedule fills the afternoon and goes past that end time. The tree lighting at 5:30 p.m. falls between an afternoon block and an evening block.

Get Omaha, NE Real Estate Updates

Get our exclusive listings sent directly to your inbox!

Contact Us

This field is required
This field is required Please enter a valid email address